[ 
https://issues.apache.org/jira/browse/BEAM-6449?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Lukasz Gajowy updated BEAM-6449:
--------------------------------
    Summary: Create PostCommit smoke test suite (besides phrase triggered one)  
(was: Create PostCommit smoke test suite)

> Create PostCommit smoke test suite (besides phrase triggered one)
> -----------------------------------------------------------------
>
>                 Key: BEAM-6449
>                 URL: https://issues.apache.org/jira/browse/BEAM-6449
>             Project: Beam
>          Issue Type: Sub-task
>          Components: testing
>            Reporter: Lukasz Gajowy
>            Assignee: Lukasz Gajowy
>            Priority: Major
>
> Load tests are very huge and consume lots of resources. In order to avoid 
> unnecessary runs on not failing code, we should have a small post-commit 
> variant that would validate if everything works well. If run post commit (on 
> every commit) such smoke tests will give us time to fix build/runtime/other 
> errors before actual load test suites are run. 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to