[
https://issues.apache.org/jira/browse/BEAM-6449?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Lukasz Gajowy updated BEAM-6449:
--------------------------------
Summary: Create PostCommit smoke test suite (besides phrase triggered one)
(was: Create PostCommit smoke test suite)
> Create PostCommit smoke test suite (besides phrase triggered one)
> -----------------------------------------------------------------
>
> Key: BEAM-6449
> URL: https://issues.apache.org/jira/browse/BEAM-6449
> Project: Beam
> Issue Type: Sub-task
> Components: testing
> Reporter: Lukasz Gajowy
> Assignee: Lukasz Gajowy
> Priority: Major
>
> Load tests are very huge and consume lots of resources. In order to avoid
> unnecessary runs on not failing code, we should have a small post-commit
> variant that would validate if everything works well. If run post commit (on
> every commit) such smoke tests will give us time to fix build/runtime/other
> errors before actual load test suites are run.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)