[
https://issues.apache.org/jira/browse/BEAM-593?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Beam JIRA Bot updated BEAM-593:
-------------------------------
Labels: stale-P2 (was: )
> Support unblocking run() in FlinkRunner and cancel() and waitUntilFinish() in
> FlinkRunnerResult
> -----------------------------------------------------------------------------------------------
>
> Key: BEAM-593
> URL: https://issues.apache.org/jira/browse/BEAM-593
> Project: Beam
> Issue Type: New Feature
> Components: runner-flink
> Reporter: Pei He
> Priority: P2
> Labels: stale-P2
> Time Spent: 1h
> Remaining Estimate: 0h
>
> We introduced both functions to PipelineResult.
> Currently, both of them throw UnsupportedOperationException in Flink runner.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)