Kamil Wasilewski created BEAM-11218:
---------------------------------------
Summary: ptest allows to obtain a pipeline result
Key: BEAM-11218
URL: https://issues.apache.org/jira/browse/BEAM-11218
Project: Beam
Issue Type: Sub-task
Components: sdk-go
Reporter: Kamil Wasilewski
ptest should allow to obtain a pipeline result, which would enable using
metrics in testing scenarios. This can be done either by adding a new endpoint
(e.g. `ptest.RunWithMetrics`) or replacing the existing `ptest.Run` with a new
version.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)