[ 
https://issues.apache.org/jira/browse/BEAM-11218?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Beam JIRA Bot updated BEAM-11218:
---------------------------------
    Labels: stale-P2  (was: )

> ptest allows to obtain a pipeline result
> ----------------------------------------
>
>                 Key: BEAM-11218
>                 URL: https://issues.apache.org/jira/browse/BEAM-11218
>             Project: Beam
>          Issue Type: Sub-task
>          Components: sdk-go
>            Reporter: Kamil Wasilewski
>            Priority: P2
>              Labels: stale-P2
>
> ptest should allow to obtain a pipeline result, which would enable using 
> metrics in testing scenarios. This can be done either by adding a new 
> endpoint (e.g. `ptest.RunWithMetrics`) or replacing the existing `ptest.Run` 
> with a new version.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to