Maximilian Michels created BEAM-6608:
----------------------------------------

             Summary: Flink Runner prepares to-be-staged file too late 
                 Key: BEAM-6608
                 URL: https://issues.apache.org/jira/browse/BEAM-6608
             Project: Beam
          Issue Type: Bug
          Components: runner-flink
    Affects Versions: 2.10.0
            Reporter: Maximilian Michels
            Assignee: Maximilian Michels
             Fix For: 2.11.0


Before execution, the Flink Runner prepares all necessary files, in order for 
them to be shipped to the remote cluster.

Due to a recent regression via BEAM-2873, the preparation is performed after 
the execution environment has been initialized. This skips the preparation 
phase and results in invalid files being shipped.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to