[
https://issues.apache.org/jira/browse/BEAM-11218?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Robert Burke updated BEAM-11218:
--------------------------------
Resolution: Fixed
Status: Resolved (was: Open)
> ptest allows to obtain a pipeline result
> ----------------------------------------
>
> Key: BEAM-11218
> URL: https://issues.apache.org/jira/browse/BEAM-11218
> Project: Beam
> Issue Type: Sub-task
> Components: sdk-go
> Reporter: Kamil Wasilewski
> Assignee: Ritesh Ghorse
> Priority: P3
> Time Spent: 1h 50m
> Remaining Estimate: 0h
>
> ptest should allow to obtain a pipeline result, which would enable using
> metrics in testing scenarios. This can be done either by adding a new
> endpoint (e.g. `ptest.RunWithMetrics`) or replacing the existing `ptest.Run`
> with a new version.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)