[
https://issues.apache.org/jira/browse/BEAM-12940?focusedWorklogId=674428&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-674428
]
ASF GitHub Bot logged work on BEAM-12940:
-----------------------------------------
Author: ASF GitHub Bot
Created on: 03/Nov/21 07:58
Start Date: 03/Nov/21 07:58
Worklog Time Spent: 10m
Work Description: snkalinin commented on pull request #15793:
URL: https://github.com/apache/beam/pull/15793#issuecomment-958721879
@tvalentyn Added readme file
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: [email protected]
For queries about this service, please contact Infrastructure at:
[email protected]
Issue Time Tracking
-------------------
Worklog Id: (was: 674428)
Time Spent: 0.5h (was: 20m)
> [Playground] Infrastructure Deployment scripts
> ----------------------------------------------
>
> Key: BEAM-12940
> URL: https://issues.apache.org/jira/browse/BEAM-12940
> Project: Beam
> Issue Type: New Feature
> Components: beam-playground
> Reporter: Alex Kosolapov
> Assignee: Sergey Kalinin
> Priority: P3
> Labels: beam-playground-devops, beam-playground-sprint-2,
> beam-playground-sprint-3
> Time Spent: 0.5h
> Remaining Estimate: 0h
>
> As a Beam Playground maintainer, I want to be able to deploy a Playground
> environment to a GCP project using IaC scripts.
> Acceptance criteria
> # Terraform scripts for frontend AppEngine prepared
> # Terraform scripts for backend AppEngine prepared
> # Terraform scripts for storage prepared
> # Terraform scripts for VPC and Subnets prepared
> # Draft Deployment instruction/FAQ
--
This message was sent by Atlassian Jira
(v8.3.4#803005)