[ 
https://issues.apache.org/jira/browse/BEAM-13178?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Aydar Zaynutdinov updated BEAM-13178:
-------------------------------------
    Description: 
Now controller contains too much additional logic.

Need to refactor it.

  was:Now controller contains too much additional logic. Need to refactor it.


> [Playground] Refactoring for controller
> ---------------------------------------
>
>                 Key: BEAM-13178
>                 URL: https://issues.apache.org/jira/browse/BEAM-13178
>             Project: Beam
>          Issue Type: Sub-task
>          Components: beam-playground
>            Reporter: Aydar Zaynutdinov
>            Assignee: Aydar Zaynutdinov
>            Priority: P3
>              Labels: beam-playground-backend, beam-playground-sprint-3
>
> Now controller contains too much additional logic.
> Need to refactor it.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to