[ 
https://issues.apache.org/jira/browse/BEAM-12260?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Anonymous updated BEAM-12260:
-----------------------------
    Status: Triage Needed  (was: Resolved)

> Java - Backport FirestoreIO connector's ramp-up to DatastoreIO connector
> ------------------------------------------------------------------------
>
>                 Key: BEAM-12260
>                 URL: https://issues.apache.org/jira/browse/BEAM-12260
>             Project: Beam
>          Issue Type: Improvement
>          Components: io-java-gcp
>            Reporter: Daniel Thevessen
>            Assignee: Daniel Thevessen
>            Priority: P2
>             Fix For: 2.32.0
>
>          Time Spent: 3h 10m
>  Remaining Estimate: 0h
>
> The FirestoreIO connector 
> ([BEAM-8376|https://issues.apache.org/jira/browse/BEAM-8376]) for the Java 
> SDK is currently out for review.  
> Some of the features for the Firestore connector are new relative to the 
> Datastore connector, so the Firestore team would like to add them there as 
> well. Most notably the Firestore connector has a gradual ramp-up feature that 
> slowly increases throughput in line with Datastore/Firestore best practices.  
> Some minor adjustments to constants for batch sizing and backoff may also be 
> worth looking at.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to