[
https://issues.apache.org/jira/browse/BEAM-8183?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Anonymous updated BEAM-8183:
----------------------------
Status: Triage Needed (was: Triage Needed)
> Optionally bundle multiple pipelines into a single Flink jar
> ------------------------------------------------------------
>
> Key: BEAM-8183
> URL: https://issues.apache.org/jira/browse/BEAM-8183
> Project: Beam
> Issue Type: New Feature
> Components: runner-flink
> Reporter: Kyle Weaver
> Assignee: Kyle Weaver
> Priority: P2
> Labels: portability-flink
> Fix For: 2.17.0
>
> Time Spent: 3h
> Remaining Estimate: 0h
>
> [https://github.com/apache/beam/pull/9331#issuecomment-526734851]
> "With Flink you can bundle multiple entry points into the same jar file and
> specify which one to use with optional flags. It may be desirable to allow
> inclusion of multiple pipelines for this tool also, although that would
> require a different workflow. Absent this option, it becomes quite convoluted
> for users that need the flexibility to choose which pipeline to launch at
> submission time."
--
This message was sent by Atlassian Jira
(v8.20.10#820010)