[
https://issues.apache.org/jira/browse/BEAM-8119?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Mark Liu reassigned BEAM-8119:
------------------------------
Assignee: Mark Liu
> The python RC validation script need cleanup the pubsub resources after
> finish.
> -------------------------------------------------------------------------------
>
> Key: BEAM-8119
> URL: https://issues.apache.org/jira/browse/BEAM-8119
> Project: Beam
> Issue Type: Sub-task
> Components: testing
> Reporter: Yifan Zou
> Assignee: Mark Liu
> Priority: Major
> Fix For: Not applicable, 2.16.0
>
> Time Spent: 2h
> Remaining Estimate: 0h
>
> * Python staging artifacts were moved to ‘python/’ directory. This needs to
> be fixed in the script, otherwise the script won’t download the sdks and hash
> files correctly.
> * If the test fails, it sometimes left some died pubsub topics. This might
> cause failures in the reruns since the resources already exist:
> * ERROR: Failed to create topic
> [projects/apache-beam-testing/topics/wordstream-python-topic-1]: Resource
> already exists in the project (resource=wordstream-python-topic-1).
> * *Workaround*: I manually deleted the topics using cmd: gcloud alpha pubsub
> topics delete wordstream-python-topic-1
> * TODO:
> ** Change the download directory in the script.
> ** Add cleanup if the job was interrupted.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)