[
https://issues.apache.org/jira/browse/BEAM-9137?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17017754#comment-17017754
]
sunjincheng edited comment on BEAM-9137 at 1/17/20 7:14 AM:
------------------------------------------------------------
I have a quick look at of this issue and it seems that the
beam_PostCommit_Py_ValCont was broken on 20 Dec, 2019.
We can see that it succeed on [19 Dec 2019
|http://mail-archives.apache.org/mod_mbox/beam-builds/201912.mbox/%3c100795298.3239.1576775433670.JavaMail.jenkins@jenkins02%3e]and
failed on [20 Dec,
2019|http://mail-archives.apache.org/mod_mbox/beam-builds/201912.mbox/%3c165865149.3447.1576823413985.JavaMail.jenkins@jenkins02%3e].
So, maybe we should focus on the commits of that day.
was (Author: sunjincheng121):
I have a quick look at of this issue and it seems that the
beam_PostCommit_Py_ValCont was broken on 20 Dec, 2019.
We can see that it succeed on [19 Dec 2019
|http://mail-archives.apache.org/mod_mbox/beam-builds/201912.mbox/%3c100795298.3239.1576775433670.JavaMail.jenkins@jenkins02%3e]and
failed on [20 Dec,
2019|http://mail-archives.apache.org/mod_mbox/beam-builds/201912.mbox/%3c165865149.3447.1576823413985.JavaMail.jenkins@jenkins02%3e].
> PR10338 breaks beam_PostCommit_Py_ValCont
> -----------------------------------------
>
> Key: BEAM-9137
> URL: https://issues.apache.org/jira/browse/BEAM-9137
> Project: Beam
> Issue Type: Bug
> Components: test-failures
> Affects Versions: 2.19.0
> Reporter: Boyuan Zhang
> Priority: Blocker
> Fix For: 2.19.0
>
>
> For the first failure, please refer to
> https://builds.apache.org/job/beam_PostCommit_Py_ValCont/5172/#showFailuresLink
--
This message was sent by Atlassian Jira
(v8.3.4#803005)