Claus Ibsen created CAMEL-25720:
-----------------------------------

             Summary: camel-jbang - Run the tests of camel-jbang-core in 
parallel
                 Key: CAMEL-25720
                 URL: https://issues.apache.org/jira/browse/CAMEL-25720
             Project: Camel
          Issue Type: Task
          Components: camel-jbang
            Reporter: Claus Ibsen
            Assignee: Claus Ibsen
             Fix For: 4.24.0


The tests of camel-jbang-core run one JVM per test class, one class at a time 
({{forkCount=1}}, {{reuseForks=false}}). Aurélien Pupier noted that in a 
{{-T1C}} build on Jenkins they take almost 20% of the time, almost alone, as 
the module comes late in the build.

The surefire time of the module, measured locally (14 cores, JDK 25):

||Setup||Time||Result||
|today: a new JVM per test class (297 classes), one at a time|399 s|all pass|
|4 reused forks, nothing else changed|116 s|161 tests fail in 56 classes|
|4 reused forks, with the changes below|96 s|all pass|

*Why the tests do not run in parallel*
* {{dsl/pom.xml}} sets {{camel.surefire.parallel=true}}, so with a reused JVM 
the classes would run at the same time in one JVM, while the CLI keeps the home 
directory in a static field ({{CommandLineHelper.useHomeDir}}). 
{{reuseForks=false}} avoids that, at the cost of a JVM per class: half of the 
classes run in less than 0.5 seconds.
* Forks share the file system: fixed homes of the tests ({{target}}, 
{{target/test-action}}, {{target/test-process}}, ...), the working directory of 
the module ({{camel run}} deletes {{.camel-jbang}}, {{camel export}} builds in 
{{.camel-jbang/work}}, a local {{camel-cli.properties}}), and the fixed port 
2121 of the ftp service of {{camel infra run}}.
* A test that sets no home uses the {{~/.camel}} of the developer.
* {{ExportTest}} alone takes 95 seconds: every export builds a new 
{{KameletsCatalog}}, which scans the whole classpath, and reads each Quarkus 
platform BOM with XPath.

*The change* (two PRs)
# Tests: 4 reused forks, a home of their own per fork ({{user.home}} under 
{{target}}) and per test, and the tests that use the working directory or a 
fixed port ({{@UsesWorkingDirectory}}, {{@UsesFixedPort}}) run after the 
others, one class at a time, in a fork of their own.
# Load a released kamelet catalog, and the versions of a released Quarkus 
platform BOM, once per JVM, as camel shell, the TUI, the MCP server and the 
tests run several commands in one JVM. {{ExportTest}} then runs in 44 seconds.

*Possible follow-ups*
* {{camel export}} with a staging directory of its own instead of 
{{.camel-jbang/work}}, so the export tests can run in the parallel forks too, 
and {{ExportTest}} split up: about 50-60 seconds.
* No static home or work directory in the CLI (the embedding item of 
CAMEL-25400), so the tests could also run concurrently in one JVM.

_Claude Code on behalf of davsclaus_



--