[
https://issues.apache.org/jira/browse/CAMEL-26726?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Claus Ibsen reassigned CAMEL-26726:
-----------------------------------
Assignee: Claus Ibsen
> camel-chaos - expectations on the time of a route and on the messages lost
> between two routes
> ---------------------------------------------------------------------------------------------
>
> Key: CAMEL-26726
> URL: https://issues.apache.org/jira/browse/CAMEL-26726
> Project: Camel
> Issue Type: New Feature
> Components: camel-jbang
> Reporter: Claus Ibsen
> Assignee: Claus Ibsen
> Priority: Major
> Fix For: 4.24.0
>
>
> W-8 of the stage 2 decisions on CAMEL-26607: the delay recipes have nothing
> to check today, and "nothing was lost between two routes" is the question
> people ask.
> * {{expect=orders:meanTime<=2s}} and {{expect=orders:maxTime<=5s}}: the time
> of the exchanges in the route, from entering it until the route is done with
> them, measured by chaos (so in virtual time in a simulation test). maxTime is
> decided as soon as one exchange is slower; meanTime when the time is up. A
> time of no exchange is not met. The route statistics have no p99, so that is
> left out.
> * {{expect=orders->shipping:lost<=0}}: the messages completed in the first
> route and not in the second, counted until the time is up; the missing ones
> count as lost in the report.
> * The report, the rule in plain words, the model and the docs say them.
--
This message was sent by Atlassian Jira
(v10.3.26#10030026)