Viktor Khoroshko created CAMEL-11632:
----------------------------------------
Summary: QuartzScheduledPollConsumerScheduler causes trigger
misfires on each application restart
Key: CAMEL-11632
URL: https://issues.apache.org/jira/browse/CAMEL-11632
Project: Camel
Issue Type: Bug
Components: camel-quartz2
Affects Versions: 2.19.0
Environment: *strong text*
Reporter: Viktor Khoroshko
Recently I noticed that on application start Quartz founds and triggers
misfired triggers:
{code:java}
INFO o.s.s.q.LocalDataSourceJobStore - Handling 1 trigger(s) that missed their
scheduled fire-time.
{code}
That wasn't not the realistic case in my scenario - since I could see in a
database that NEXT_FIRE_TIME is much ahead of the current time.
After digging a little I found the issue in the
*QuartzScheduledPollConsumerScheduler*:
{code:java}
// Ensure the cron schedule is updated
CronTrigger newTrigger =
existingTrigger.getTriggerBuilder().withSchedule(CronScheduleBuilder.cronSchedule(getCron()).inTimeZone(getTimeZone())).build();
quartzScheduler.rescheduleJob(triggerKey, newTrigger);
{code}
There 2 issues here:
1. Job is rescheduled even if nothing has been changed (i.e. cron expression,
crom timezone)
2. existingTrigger.getTriggerBuilder() returns trigger builder with START_TIME
of existing trigger which, surely, is the past. This is causing the described
bug - NEXT_FIRE_TIME is calculated based on the old START_TIME and is in the
past also. So rescheduled trigger becomes misfired trigger immediately.
Proposal:
1. Do not reschedule job is nothing has been changed.
2. If job needs to be rescheduler - make sure to set START_TIME to a current
date.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)