[ 
https://issues.apache.org/jira/browse/MATH-950?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Luc Maisonobe resolved MATH-950.
--------------------------------

    Resolution: Fixed

Fixed in subversion repository as of r1458294.
                
> event state not updated if an unrelated event triggers a RESET_STATE during 
> ODE integration
> -------------------------------------------------------------------------------------------
>
>                 Key: MATH-950
>                 URL: https://issues.apache.org/jira/browse/MATH-950
>             Project: Commons Math
>          Issue Type: Bug
>    Affects Versions: 3.1.1
>            Reporter: Luc Maisonobe
>            Assignee: Luc Maisonobe
>            Priority: Critical
>             Fix For: 3.2
>
>         Attachments: wrong-event-scheduling.patch
>
>
> When an ODE solver manages several different event types, there are some 
> unwanted side effects.
> If one event handler asks for a RESET_STATE (for integration state) when its 
> eventOccurred method is called, the other event handlers that did not trigger 
> an event in the same step are not updated correctly, due to an early return.
> As a result, when the next step is processed with a reset integration state, 
> the forgotten event still refer to the start date of the previous state. This 
> implies that when these event handlers will be checked for In some cases, the 
> function defining an event g(double t, double[] y) is called with state 
> parameters y that are completely wrong. In one case when the y array should 
> have contained values between -1 and +1, one function call got values up to 
> 1.0e20.
> The attached file reproduces the problem.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to