Purge old Build-Results
-----------------------
Key: CONTINUUM-1809
URL: http://jira.codehaus.org/browse/CONTINUUM-1809
Project: Continuum
Issue Type: Improvement
Components: Database
Affects Versions: 1.1
Reporter: Marc Lustig
If you do e. g. an hourly build, then the list of build-results will easily
blow up after a couple of days, and so the database.
There should be an option to configure the limitation of the history of
build-results, on either of the levels:
- project-level
- group-level
- global level
Old Build-Results should be purged automatically, i. e. without
user-interaction.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira