Schedule created through XML-RPC aren't activated upon creation
---------------------------------------------------------------
Key: CONTINUUM-2000
URL: http://jira.codehaus.org/browse/CONTINUUM-2000
Project: Continuum
Issue Type: Bug
Components: Core system
Affects Versions: 1.2.2
Reporter: Philippe Busque
Upon upgrading to version 1.2.2, I noticed that every job scheduled by a
schedule created through a XML-RPC call are never activated.
When the schedule reach its starting time, it is ignored (no trace in the log).
The only way to activate a schedule is by either modifying the created
schedule through the web interface or restarting the server. Modifying the
schedule through the interface actually leave trace in the log that it is being
started.
How to reproduce:
Create a new schedule assign this schedule to a new group build definition and
a job, all through the XML-RPC.
Wait for the monitor to start.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira