Failed Build results do not always agree with e-mail
----------------------------------------------------
Key: CONTINUUM-2428
URL: http://jira.codehaus.org/browse/CONTINUUM-2428
Project: Continuum
Issue Type: Bug
Environment: Version: 1.3.4-SNAPSHOT
Build Number: 790494
Reporter: SebbASF
Priority: Critical
Attachments: ContinuumBugs.zip
The e-mail sent for a failed build has a link to the build results.
One would expect the build outputs to agree with each other, but that is not
always the case.
See the attached examples. Here is the build result summary covering the runs.
Corresponding buildId in () at the end
{code}
Jan 08, 2010 06:29:25 AM PST Jan 08, 2010 06:29:34 AM PST Duration : 9 sec
Failed (267250)
Jan 08, 2010 06:29:19 AM PST Jan 08, 2010 06:29:25 AM PST Duration : 5 sec
Error
Jan 08, 2010 03:45:43 AM PST Jan 08, 2010 03:45:46 AM PST Duration : 3 sec
Error
Jan 08, 2010 01:49:48 AM PST Jan 08, 2010 01:49:57 AM PST Duration : 8 sec
Failed (267134)
Jan 08, 2010 01:49:31 AM PST Jan 08, 2010 01:49:39 AM PST Duration : 7 sec
Error
Jan 08, 2010 12:33:12 AM PST Jan 08, 2010 12:35:04 AM PST Duration : 1 min
51 sec Failed (267099)
133 Jan 07, 2010 03:29:05 PM PST Jan 07, 2010 03:30:27 PM PST Duration : 1 min
21 sec Success
{code}
It looks like the reporting of failed runs is badly broken.
Two of the runs marked as Failed must actually have been Error, because the
run-time is too short.
No mails appear to have been sent for the runs marked as Error.
Furthermore, the Failed e-mails contain a "Build Number" that is irrelevant.
Another (minor) issue is that the times are reported in different formats:
sometimes PST, sometimes -0800.
It would be best if the -0800 was always used.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira