[
https://jira.codehaus.org/browse/CONTINUUM-2594?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Brent N Atkinson reassigned CONTINUUM-2594:
-------------------------------------------
Assignee: Brent N Atkinson
> After a build is canceled, the error icon links to the last completed build
> ---------------------------------------------------------------------------
>
> Key: CONTINUUM-2594
> URL: https://jira.codehaus.org/browse/CONTINUUM-2594
> Project: Continuum
> Issue Type: Bug
> Components: Web - UI
> Affects Versions: 1.3.6
> Reporter: Wendy Smoak
> Assignee: Brent N Atkinson
> Priority: Minor
> Labels: backlog-to-cleanup
> Fix For: 1.5.0
>
>
> When a build runs too long and gets canceled, Continuum correctly shows the
> red X 'error' icon.
> However, clicking that icon brings you to the build results of the last
> completed build, not the partial output of the one that got canceled.
> (Likewise the numbered build results link to the right also goes to the last
> completed build.)
> This is very confusing, until you notice the old date on the results and
> realize you are not looking at the results from the error.
--
This message was sent by Atlassian JIRA
(v6.1.6#6162)