[ 
https://issues.apache.org/jira/browse/CONTINUUM-2762?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14533004#comment-14533004
 ] 

Brent N Atkinson commented on CONTINUUM-2762:
---------------------------------------------

While tracing through the code, I saw in section of code that was commented out 
a reference to CONTINUUM-1871. The resemblance to this issue was striking.

> Computation of previous SCM changes sometimes includes entire history
> ---------------------------------------------------------------------
>
>                 Key: CONTINUUM-2762
>                 URL: https://issues.apache.org/jira/browse/CONTINUUM-2762
>             Project: Continuum
>          Issue Type: Bug
>    Affects Versions: 1.4.2
>            Reporter: Brent N Atkinson
>             Fix For: 1.5.0
>
>         Attachments: CONTINUUM-2762-evidence.zip
>
>
> As exhibited here:
> https://continuum-ci.apache.org/continuum/buildResult.action?buildId=39701&projectId=11
> There are times when Continuum incorrectly computes the changes since the 
> prior build to be the entire SCM history. In this case, a notification was 
> also sent to all contributors and contained the entire change log. It also 
> worth noting that this also causes continuum to store the information in the 
> database, which can be considerable for projects with long histories.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to