Steven Phillips created DRILL-2541:
--------------------------------------
Summary: Plan fragment logging causes significant delay in query
start
Key: DRILL-2541
URL: https://issues.apache.org/jira/browse/DRILL-2541
Project: Apache Drill
Issue Type: Bug
Reporter: Steven Phillips
Assignee: Steven Phillips
In the getQueryWorkUnit() method of Foreman, we are logging information about
every plan fragment at info level, and this is causing a noticeable delay (~10
seconds) in query start time.
This should be moved to trace log level.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)