Steven Phillips created DRILL-2541:
--------------------------------------

             Summary: Plan fragment logging causes significant delay in query 
start
                 Key: DRILL-2541
                 URL: https://issues.apache.org/jira/browse/DRILL-2541
             Project: Apache Drill
          Issue Type: Bug
            Reporter: Steven Phillips
            Assignee: Steven Phillips


In the getQueryWorkUnit() method of Foreman, we are logging information about 
every plan fragment at info level, and this is causing a noticeable delay (~10 
seconds) in query start time.

This should be moved to trace log level.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to