[ https://issues.apache.org/jira/browse/DRILL-2501?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Steven Phillips resolved DRILL-2501. ------------------------------------ Resolution: Invalid This looks like an issue with MapR's rpm packaging. Please file an jira in the appropriate place. > POSTINST upgrade checks old drill install folder for drill pid to stop > ---------------------------------------------------------------------- > > Key: DRILL-2501 > URL: https://issues.apache.org/jira/browse/DRILL-2501 > Project: Apache Drill > Issue Type: Bug > Components: Tools, Build & Test > Reporter: Krystal > Assignee: Steven Phillips > > I originally upgraded drill 0.7 to drill 0.8. Then I upgraded drill 0.8 to > another 0.8. So now I have the following folers: > mfs47:~ # ls -l /opt/mapr/drill > total 12 > drwxr-xr-x 4 mapr root 4096 Mar 18 15:49 drill-0.7.0 > drwxr-xr-x 2 mapr root 4096 Mar 19 12:08 drill-0.8.0 > drwxr-xr-x 4 root root 4096 Mar 19 10:45 OLD_DRILL_VERSIONS > During the post install of upgrade of 0.8 to another 0.8, it tries to stop > the drillbit but failed as shown below: > "The following package is going to be REMOVED: > mapr-drill > 1 package to remove. > After the operation, 190.7 MiB will be freed. > Continue? [y/n/?] (y): y > Removing mapr-drill-0.8.0.31020-1 [done] > Additional rpm output: > no drillbit to stop because kill -0 of pid 16852 failed with status 1" > pid 16852 belongs to drill 0.7. > cat /opt/mapr/drill/drill-0.7.0/drillbit.pid > 16852 > Looks like it is grabbing the first directory that it finds? -- This message was sent by Atlassian JIRA (v6.3.4#6332)