[ 
https://issues.apache.org/jira/browse/DRILL-5699?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16121496#comment-16121496
 ] 

Arina Ielchiieva edited comment on DRILL-5699 at 8/10/17 11:28 AM:
-------------------------------------------------------------------

Updated Jira status. To get into weekly batch commits Jira status should be 
Reviewable and ready-to-commit label present.
After changes are merged into master, Jira status should be changed to 
Resolved, comment with commit id added and PR is closed. 
Usually all this should be done by weekly batch committer if not it can be done 
by the developer.


was (Author: arina):
Updated Jira status. To get into weekly batch commits Jira status should be in 
Reviewable and ready-to-commit label present.
After changes are merged into master, Jira status should be changed to 
Resolved, comment with commit id added and PR is closed. 
Usually all this should be done by weekly batch committer if not it can be done 
by the developer.

> Drill Web UI Page Source Has Links To External Sites
> ----------------------------------------------------
>
>                 Key: DRILL-5699
>                 URL: https://issues.apache.org/jira/browse/DRILL-5699
>             Project: Apache Drill
>          Issue Type: Bug
>          Components: Client - HTTP
>            Reporter: Sindhuri Ramanarayan Rayavaram
>            Assignee: Sindhuri Ramanarayan Rayavaram
>            Priority: Minor
>              Labels: ready-to-commit
>             Fix For: 1.12.0
>
>
> Drill uses external CDN for javascript and css files in the result page. When 
> there is no internet connection this page fails to load. 



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to