https://issues.apache.org/jira/browse/DRILL-6453?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16539458#comment-16539458
 ] 

Boaz Ben-Zvi commented on DRILL-6453:
-------------------------------------

The jstacks before the failure look like normal work; the upper hash joins are 
"sniffing", and the lower ones are doing actual work (building the inner, or 
probing with the outer). None of the logs shows any spilling (though spilling 
did happen).
  We thought that DRILL-6517 was the trigger for this failure (cancel after 
2:11); but now with the fix it looks the other way - this failure was causing 
DRILL-6517 to show.


> TPC-DS query 72 has regressed
> -----------------------------
>
>                 Key: DRILL-6453
>                 URL: https://issues.apache.org/jira/browse/DRILL-6453
>             Project: Apache Drill
>          Issue Type: Bug
>          Components: Execution - Flow
>    Affects Versions: 1.14.0
>            Reporter: Khurram Faraaz
>            Assignee: Boaz Ben-Zvi
>            Priority: Blocker
>             Fix For: 1.14.0
>
>         Attachments: 24f75b18-014a-fb58-21d2-baeab5c3352c.sys.drill, 
> jstack_29173_June_10_2018.txt, jstack_29173_June_10_2018.txt, 
> jstack_29173_June_10_2018_b.txt, jstack_29173_June_10_2018_b.txt, 
> jstack_29173_June_10_2018_c.txt, jstack_29173_June_10_2018_c.txt, 
> jstack_29173_June_10_2018_d.txt, jstack_29173_June_10_2018_d.txt, 
> jstack_29173_June_10_2018_e.txt, jstack_29173_June_10_2018_e.txt
>
>
> TPC-DS query 72 seems to have regressed, query profile for the case where it 
> Canceled after 2 hours on Drill 1.14.0 is attached here.
> {noformat}
> On, Drill 1.14.0-SNAPSHOT 
> commit : 931b43e (TPC-DS query 72 executed successfully on this commit, took 
> around 55 seconds to execute)
> SF1 parquet data on 4 nodes; 
> planner.memory.max_query_memory_per_node = 10737418240. 
> drill.exec.hashagg.fallback.enabled = true
> TPC-DS query 72 executed successfully & took 47 seconds to complete execution.
> {noformat}
> {noformat}
> TPC-DS data in the below run has date values stored as DATE datatype and not 
> VARCHAR type
> On, Drill 1.14.0-SNAPSHOT
> commit : 82e1a12
> SF1 parquet data on 4 nodes; 
> planner.memory.max_query_memory_per_node = 10737418240. 
> drill.exec.hashagg.fallback.enabled = true
> and
> alter system set `exec.hashjoin.num_partitions` = 1;
> TPC-DS query 72 executed for 2 hrs and 11 mins and did not complete, I had to 
> Cancel it by stopping the Foreman drillbit.
> As a result several minor fragments are reported to be in 
> CANCELLATION_REQUESTED state on UI.
> {noformat}



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to