[
https://issues.apache.org/jira/browse/DRILL-6453?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16572405#comment-16572405
]
ASF GitHub Bot commented on DRILL-6453:
---------------------------------------
Ben-Zvi commented on a change in pull request #1408: DRILL-6453: Resolve
deadlock when reading from build and probe sides simultaneously in HashJoin
URL: https://github.com/apache/drill/pull/1408#discussion_r208401247
##########
File path:
exec/java-exec/src/main/java/org/apache/drill/exec/physical/impl/join/HashJoinBatch.java
##########
@@ -248,95 +257,134 @@ protected void buildSchema() throws
SchemaChangeException {
}
}
Review comment:
It would be nicer if *buildSchema()* was calling the "standard"
*prefetchFirstBatchFromBothSides()* like the other binary operators (sans MJ).
Instead of having specialized different code, and modifying the RecordBatch
just for the hash join.
----------------------------------------------------------------
This is an automated message from the Apache Git Service.
To respond to the message, please log on GitHub and use the
URL above to go to the specific comment.
For queries about this service, please contact Infrastructure at:
[email protected]
> TPC-DS query 72 has regressed
> -----------------------------
>
> Key: DRILL-6453
> URL: https://issues.apache.org/jira/browse/DRILL-6453
> Project: Apache Drill
> Issue Type: Bug
> Components: Execution - Flow
> Affects Versions: 1.14.0
> Reporter: Khurram Faraaz
> Assignee: Timothy Farkas
> Priority: Blocker
> Fix For: 1.15.0
>
> Attachments: 24f75b18-014a-fb58-21d2-baeab5c3352c.sys.drill,
> jstack_29173_June_10_2018.txt, jstack_29173_June_10_2018.txt,
> jstack_29173_June_10_2018_b.txt, jstack_29173_June_10_2018_b.txt,
> jstack_29173_June_10_2018_c.txt, jstack_29173_June_10_2018_c.txt,
> jstack_29173_June_10_2018_d.txt, jstack_29173_June_10_2018_d.txt,
> jstack_29173_June_10_2018_e.txt, jstack_29173_June_10_2018_e.txt
>
>
> TPC-DS query 72 seems to have regressed, query profile for the case where it
> Canceled after 2 hours on Drill 1.14.0 is attached here.
> {noformat}
> On, Drill 1.14.0-SNAPSHOT
> commit : 931b43e (TPC-DS query 72 executed successfully on this commit, took
> around 55 seconds to execute)
> SF1 parquet data on 4 nodes;
> planner.memory.max_query_memory_per_node = 10737418240.
> drill.exec.hashagg.fallback.enabled = true
> TPC-DS query 72 executed successfully & took 47 seconds to complete execution.
> {noformat}
> {noformat}
> TPC-DS data in the below run has date values stored as DATE datatype and not
> VARCHAR type
> On, Drill 1.14.0-SNAPSHOT
> commit : 82e1a12
> SF1 parquet data on 4 nodes;
> planner.memory.max_query_memory_per_node = 10737418240.
> drill.exec.hashagg.fallback.enabled = true
> and
> alter system set `exec.hashjoin.num_partitions` = 1;
> TPC-DS query 72 executed for 2 hrs and 11 mins and did not complete, I had to
> Cancel it by stopping the Foreman drillbit.
> As a result several minor fragments are reported to be in
> CANCELLATION_REQUESTED state on UI.
> {noformat}
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)