[ 
https://issues.apache.org/jira/browse/DRILL-6381?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Bridget Bevens updated DRILL-6381:
----------------------------------
    Labels: doc-complete ready-to-commit  (was: doc-impacting ready-to-commit)

> Add capability to do index based planning and execution
> -------------------------------------------------------
>
>                 Key: DRILL-6381
>                 URL: https://issues.apache.org/jira/browse/DRILL-6381
>             Project: Apache Drill
>          Issue Type: New Feature
>          Components: Execution - Relational Operators, Query Planning & 
> Optimization
>            Reporter: Aman Sinha
>            Assignee: Aman Sinha
>            Priority: Major
>              Labels: doc-complete, ready-to-commit
>             Fix For: 1.15.0
>
>
> If the underlying data source supports indexes (primary and secondary 
> indexes), Drill should leverage those during planning and execution in order 
> to improve query performance.  
> On the planning side, Drill planner should be enhanced to provide an 
> abstraction layer which express the index metadata and statistics.  Further, 
> a cost-based index selection is needed to decide which index(es) are 
> suitable.  
> On the execution side, appropriate operator enhancements would be needed to 
> handle different categories of indexes such as covering, non-covering 
> indexes, taking into consideration the index data may not be co-located with 
> the primary table, i.e a global index.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to