[ 
https://issues.apache.org/jira/browse/FINERACT-722?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Michael Vorburger resolved FINERACT-722.
----------------------------------------
      Assignee: Michael Vorburger  (was: Ed Cable)
    Resolution: Fixed

> Integration test cases fail when run on the 1st of a month
> ----------------------------------------------------------
>
>                 Key: FINERACT-722
>                 URL: https://issues.apache.org/jira/browse/FINERACT-722
>             Project: Apache Fineract
>          Issue Type: Bug
>    Affects Versions: 1.2.0, 1.3.0
>            Reporter: Vishwas Babu A J
>            Assignee: Michael Vorburger
>            Priority: Major
>              Labels: gsoc2019
>             Fix For: 1.4.0
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> Set the system clock of the machine on which the test cases are run to the 
> 1st of any month (say March 1st 2019). Now, running the test cases would 
> result in a few failures.
> The cause of each of these failures (likely issues with the test case 
> themselves, however, could also be application issues) needs to be analyzed 
> and fixed.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to