Vikranth Ramasami created FINERACT-1638:
-------------------------------------------
Summary: Overdraft is extended or partially repaid, the interest
is not being calculated correctly as it is not including previous days interest
when calculating new interest posting
Key: FINERACT-1638
URL: https://issues.apache.org/jira/browse/FINERACT-1638
Project: Apache Fineract
Issue Type: Bug
Reporter: Vikranth Ramasami
!https://mail.google.com/mail/u/1?ui=2&ik=2423ca4ec6&attid=0.2&permmsgid=msg-a:r8091266288710511693&th=1814cf2f3bd55e6b&view=fimg&fur=ip&sz=s0-l75-ft&attbid=ANGjdJ_8U3tz-Ke5-AD-zP0NuVFNuwfkCidmoREyjtbX2ykOJy5z3wF80Ng1t44FY08gCNiTv-SZ1q8qyzU8uziXNIpL49tDsERoLUb5qF_-hjBK_7XqjHkLLSh9YgQ&disp=emb&realattid=1814ceff6a3692e332!
* We are expecting the interest applied on 8{^}th{^} June to be 12.78 i.e. 1%
of 1277.95 (i.e the account balance including previous days
interest).{+}{+}{+}{+}
* Instead the interest is being posted as 12.57 which is 1% of 1257.45 (which
is the sum of only the withdrawal and withdrawal entries).
--
This message was sent by Atlassian Jira
(v8.20.7#820007)