[ 
https://issues.apache.org/jira/browse/FINERACT-1646?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Dhaval Maniyar resolved FINERACT-1646.
--------------------------------------
    Fix Version/s: 1.8.0
       Resolution: Fixed

> System is calculating incorrect Overdraft Interest on 2nd day
> -------------------------------------------------------------
>
>                 Key: FINERACT-1646
>                 URL: https://issues.apache.org/jira/browse/FINERACT-1646
>             Project: Apache Fineract
>          Issue Type: Bug
>            Reporter: Vikranth Ramasami
>            Assignee: Dhaval Maniyar
>            Priority: Major
>             Fix For: 1.8.0
>
>         Attachments: Incorrect interest on Day 2.docx
>
>
> Steps To Reproduce:
> Create a backdated savings account as on 20th June 2022
> Perform a withdrawal on 20th June 2022 for 1000
> Perform a withdrawal on 21th June 2022 for 500
> Perform a backdated interest posting on current day (Day1)
> System is posting correct interest posting
> On Day2 perform a interest posting
>  
> Actual Behavior:
> System is calculating the interest posting for 18th June and also it is 
> calculating double interest on 20th June
>  
>  



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to