Adam Saghy created FINERACT-2384:
------------------------------------
Summary: Incorrect reage transaction date and repayment schedule
Key: FINERACT-2384
URL: https://issues.apache.org/jira/browse/FINERACT-2384
Project: Apache Fineract
Issue Type: Bug
Affects Versions: 1.12.1, 1.10.1, 1.11.0
Reporter: Adam Saghy
Assignee: Adam Saghy
Fix For: 1.13.0
Current reage handling is incorrect, since the reage transaction date is always
the current date, but it should be decided based on the below strategy:
* if reage start date is earlier than current business date, reage transaction
date to be the reage start date
* otherwise it is the current business date
Also in case the reage start date is matching with the maturity date
incorrectly a new installment was created with start date equal to maturity
date, due date equal to maturity date, number of days 0. This should be merged
with last installment and / or with N+1 installment (if applicable).
*The correct behaviour would be to merged them in this case!*
--
This message was sent by Atlassian Jira
(v8.20.10#820010)