Adam Saghy created FINERACT-2384:
------------------------------------

             Summary: Incorrect reage transaction date and repayment schedule
                 Key: FINERACT-2384
                 URL: https://issues.apache.org/jira/browse/FINERACT-2384
             Project: Apache Fineract
          Issue Type: Bug
    Affects Versions: 1.12.1, 1.10.1, 1.11.0
            Reporter: Adam Saghy
            Assignee: Adam Saghy
             Fix For: 1.13.0


Current reage handling is incorrect, since the reage transaction date is always 
the current date, but it should be decided based on the below strategy:
 * if reage start date is earlier than current business date, reage transaction 
date to be the reage start date
 * otherwise it is the current business date

Also in case the reage start date is matching with the maturity date 
incorrectly a new installment was created with start date equal to maturity 
date, due date equal to maturity date, number of days 0. This should be merged 
with last installment and / or with N+1 installment (if applicable).

 

*The correct behaviour would be to merged them in this case!*



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to