[ 
https://issues.apache.org/jira/browse/FLINK-8621?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16370155#comment-16370155
 ] 

Chesnay Schepler commented on FLINK-8621:
-----------------------------------------

master: 6c9a5c7f3c63404657fc1da633bc22b62c1c1178 

> PrometheusReporterTest.endpointIsUnavailableAfterReporterIsClosed unstable on 
> Travis
> ------------------------------------------------------------------------------------
>
>                 Key: FLINK-8621
>                 URL: https://issues.apache.org/jira/browse/FLINK-8621
>             Project: Flink
>          Issue Type: Bug
>          Components: Metrics, Tests
>    Affects Versions: 1.5.0
>            Reporter: Till Rohrmann
>            Assignee: Chesnay Schepler
>            Priority: Blocker
>              Labels: test-stability
>             Fix For: 1.5.0, 1.4.2
>
>
> {{PrometheusReporterTest.endpointIsUnavailableAfterReporterIsClosed}} fails 
> on Travis: https://travis-ci.org/apache/flink/jobs/339344244



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to