[
https://issues.apache.org/jira/browse/FLINK-8976?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16405096#comment-16405096
]
Till Rohrmann commented on FLINK-8976:
--------------------------------------
My oversight. It should also work with incremental checkpoints. At least it
worked for me when trying it out. I will correct the description.
> End-to-end test: Resume with different parallelism
> --------------------------------------------------
>
> Key: FLINK-8976
> URL: https://issues.apache.org/jira/browse/FLINK-8976
> Project: Flink
> Issue Type: Sub-task
> Components: Tests
> Affects Versions: 1.5.0
> Reporter: Till Rohrmann
> Assignee: Tzu-Li (Gordon) Tai
> Priority: Blocker
> Fix For: 1.5.0
>
>
> Similar to FLINK-8975, we should have an end-to-end test which resumes a job
> with a different parallelism after taking
> a) a savepoint
> b) from the last retained checkpoint (this won't work with RocksDB
> incremental checkpoints)
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)