[
https://issues.apache.org/jira/browse/FLINK-8986?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16438729#comment-16438729
]
ASF GitHub Bot commented on FLINK-8986:
---------------------------------------
Github user walterddr commented on the issue:
https://github.com/apache/flink/pull/5849
At this moment it skips 8 of the 39 tests (PATCH & POST methods). And
there's 2 test failures and I think should be fix in another JIRA. Namely,
`/jobs/:jobid/vertices/:vertexid/subtasks/:subtaskid/attempts/attempt/accumulators`
returns a 500
`/jobs/:jobid/vertices/:vertexid/subtasks/:subtaskid/attempts/attempt/`
returns a 500
> End-to-end test: REST
> ---------------------
>
> Key: FLINK-8986
> URL: https://issues.apache.org/jira/browse/FLINK-8986
> Project: Flink
> Issue Type: Sub-task
> Components: REST, Tests
> Reporter: Till Rohrmann
> Assignee: Rong Rong
> Priority: Major
>
> We should add an end-to-end test which verifies that we can use the REST
> interface to obtain information about a running job.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)