[
https://issues.apache.org/jira/browse/FLINK-10505?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
vinoyang reassigned FLINK-10505:
--------------------------------
Assignee: vinoyang
> Treat fail signal as scheduling event
> -------------------------------------
>
> Key: FLINK-10505
> URL: https://issues.apache.org/jira/browse/FLINK-10505
> Project: Flink
> Issue Type: Sub-task
> Components: Distributed Coordination
> Affects Versions: 1.7.0
> Reporter: Till Rohrmann
> Assignee: vinoyang
> Priority: Major
> Fix For: 1.7.0
>
>
> Instead of simply calling into the {{RestartStrategy}} which restarts the
> existing {{ExecutionGraph}} with the same parallelism, the
> {{ExecutionGraphDriver}} should treat a recovery similar to the initial
> scheduling operation. First, one needs to decide on the new parallelism of
> the {{ExecutionGraph}} (scale up/scale down) wrt to the available set of
> resources. Only if the minimum configuration is fulfilled, the potentially
> rescaled {{ExecutionGraph}} will be restarted.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)