[ 
https://issues.apache.org/jira/browse/FLINK-10945?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16711471#comment-16711471
 ] 

ASF GitHub Bot commented on FLINK-10945:
----------------------------------------

zentol commented on issue #7252: [FLINK-10945] Add an InputDependencyConstraint 
to avoid resource dead…
URL: https://github.com/apache/flink/pull/7252#issuecomment-444876798
 
 
   Please open the PR against the master branch.

----------------------------------------------------------------
This is an automated message from the Apache Git Service.
To respond to the message, please log on GitHub and use the
URL above to go to the specific comment.
 
For queries about this service, please contact Infrastructure at:
us...@infra.apache.org


> Avoid resource deadlocks for finite stream jobs when resources are limited
> --------------------------------------------------------------------------
>
>                 Key: FLINK-10945
>                 URL: https://issues.apache.org/jira/browse/FLINK-10945
>             Project: Flink
>          Issue Type: Improvement
>          Components: Distributed Coordination
>    Affects Versions: 1.7.1
>            Reporter: Zhu Zhu
>            Assignee: Zhu Zhu
>            Priority: Major
>              Labels: pull-request-available
>
> Currently *resource deadlocks* can happen to finite stream jobs(or batch 
> jobs) when resources are limited. In 2 cases as below:
>  # Task Y is a pipelined downstream task of task X. When X takes all 
> resources(slots), Y cannot acquire slots to start, thus the back pressure 
> will block X to finish
>  # Task Y is a upstream task of task X. When X takes all resources(slots) and 
> Y cannot start, X cannot finish as some of its inputs are not finished
>  
> We can avoid case 1 by setting all edges to be BLOCKING to avoid pipeline 
> back pressure. However, case 2 cannot be avoided as X(downstream task) will 
> be launched when any of its input result is ready.
> To be detailed, say task X has BLOCKING upstream task Y and Z, X can be 
> launched when Z finishes, though task Y is not launched yet. This pre-launch 
> behaviour can be beneficial when there are plenty of resources, thus X can 
> process data from Z earlier before Y finishes its data processing. However, 
> resource deadlocks may happen when the resources are limited, e.g. in small 
> sessions.
>  
> I’d propose introducing a constraint named as *InputDependencyConstraint* to 
> control the scheduling of vertices. It has 2 values:
>  # *ANY*. The vertex can be scheduled when any of its inputs is consumable.
>  # *ALL*. The vertex can be scheduled when all of its inputs are consumable.
>  
> The design doc is here. 
> [https://docs.google.com/document/d/1jpqC7OW_nLOSVOg06_QCWelicVtV6Au0Krg5m_S4kjY/edit?usp=sharing]



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to