[
https://issues.apache.org/jira/browse/FLINK-3409?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Till Rohrmann closed FLINK-3409.
--------------------------------
Resolution: Duplicate
> Integrate STOP with Savepoints
> ------------------------------
>
> Key: FLINK-3409
> URL: https://issues.apache.org/jira/browse/FLINK-3409
> Project: Flink
> Issue Type: Improvement
> Components: Client, JobManager
> Reporter: Matthias J. Sax
> Priority: Major
>
> Right now, if a savepoint is triggered the job keeps running. At the same
> time, on STOP a last checkpoint should be collected for a clean shutdown
> (WIP: https://issues.apache.org/jira/browse/FLINK-3408).
> This work should enable stopping a job and getting a final savepoint at the
> same time. Thus, a job can get stopped gracefully and resumed later on using
> the gathered checkpoint.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)