[ 
https://issues.apache.org/jira/browse/FLINK-5068?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Till Rohrmann closed FLINK-5068.
--------------------------------
    Resolution: Not A Problem

No longer a problem with Flip-6.

> YARN HA: Job scheduled before TM is up leading to "Not enough free slots" 
> error
> -------------------------------------------------------------------------------
>
>                 Key: FLINK-5068
>                 URL: https://issues.apache.org/jira/browse/FLINK-5068
>             Project: Flink
>          Issue Type: Bug
>          Components: YARN
>    Affects Versions: 1.1.3
>            Reporter: Gyula Fora
>            Priority: Major
>
> On one occasion after a job manager failure, the job was could not be 
> recovered as it was scheduled before the TM was up causing an unrecoverable 
> failure.
> So I ended up with a running yarn jm + tm with enough slots with a job failed 
> (and not restarting)
> Please drop me a mail for the logs :)



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to