[ 
https://issues.apache.org/jira/browse/FLINK-10756?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Chesnay Schepler closed FLINK-10756.
------------------------------------
       Resolution: Fixed
    Fix Version/s: 1.9.0
                   1.8.1

A potential fix has been merged.

 

master: a5cc7561d840a88b959944931583ecd7521a5445

1.8: 8779040bd2ace935b877a50ede9ec269ac6fff9a

> TaskManagerProcessFailureBatchRecoveryITCase did not finish on time
> -------------------------------------------------------------------
>
>                 Key: FLINK-10756
>                 URL: https://issues.apache.org/jira/browse/FLINK-10756
>             Project: Flink
>          Issue Type: Bug
>          Components: Runtime / Coordination, Tests
>    Affects Versions: 1.6.2, 1.7.0
>            Reporter: Bowen Li
>            Assignee: Chesnay Schepler
>            Priority: Critical
>              Labels: pull-request-available, test-stability
>             Fix For: 1.8.1, 1.9.0
>
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> {code:java}
> Failed tests: 
>   
> TaskManagerProcessFailureBatchRecoveryITCase>AbstractTaskManagerProcessFailureRecoveryTest.testTaskManagerProcessFailure:207
>  The program did not finish in time
> {code}
> https://travis-ci.org/apache/flink/jobs/449439623



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to