[ 
https://issues.apache.org/jira/browse/FLINK-13075?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jark Wu updated FLINK-13075:
----------------------------
    Priority: Blocker  (was: Major)

> Project pushdown rule shouldn't require the TableSource return a modified 
> schema in blink planner
> -------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-13075
>                 URL: https://issues.apache.org/jira/browse/FLINK-13075
>             Project: Flink
>          Issue Type: Bug
>          Components: Table SQL / Planner
>            Reporter: Jark Wu
>            Assignee: Caizhi Weng
>            Priority: Blocker
>             Fix For: 1.9.0, 1.10.0
>
>
> As the javadoc of 
> {{org.apache.flink.table.sources.ProjectableTableSource#projectFields}} said, 
> the table schema of the TableSource copy must not be modified by this method. 
> However, {{PushProjectIntoTableSourceScanRule}} in blink planner requires the 
> returning a table source with the modified table schema. This conflict with 
> the javadoc and result in the TableSource works for flink planner can't work 
> for blink planner.



--
This message was sent by Atlassian JIRA
(v7.6.14#76016)

Reply via email to