[ 
https://issues.apache.org/jira/browse/FLINK-2790?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14946657#comment-14946657
 ] 

ASF GitHub Bot commented on FLINK-2790:
---------------------------------------

Github user uce commented on the pull request:

    https://github.com/apache/flink/pull/1213#issuecomment-146150504
  
    The code looks good. :-) I like the changes around the testing classes and 
the changes to the retrieval utils (that one I've looked into in more detail). 
I didn't check the YARN logic in detail though. I'm going to try it out now 
locally and report back. I expect that to work just fine and then we can safely 
merge this I think. :)


> Add high availability support for Yarn
> --------------------------------------
>
>                 Key: FLINK-2790
>                 URL: https://issues.apache.org/jira/browse/FLINK-2790
>             Project: Flink
>          Issue Type: Sub-task
>          Components: JobManager, TaskManager
>            Reporter: Till Rohrmann
>             Fix For: 0.10
>
>
> Add master high availability support for Yarn. The idea is to let Yarn 
> restart a failed application master in a new container. For that, we set the 
> number of application retries to something greater than 1. 
> From version 2.4.0 onwards, it is possible to reuse already started 
> containers for the TaskManagers, thus, avoiding unnecessary restart delays.
> From version 2.6.0 onwards, it is possible to specify an interval in which 
> the number of application attempts have to be exceeded in order to fail the 
> job. This will prevent long running jobs from eventually depleting all 
> available application attempts.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to