[
https://issues.apache.org/jira/browse/FLINK-14284?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
ASF GitHub Bot updated FLINK-14284:
-----------------------------------
Labels: pull-request-available (was: )
> Add shut down future to Dispatcher
> ----------------------------------
>
> Key: FLINK-14284
> URL: https://issues.apache.org/jira/browse/FLINK-14284
> Project: Flink
> Issue Type: Improvement
> Components: Runtime / Coordination
> Affects Versions: 1.10.0
> Reporter: Till Rohrmann
> Assignee: Till Rohrmann
> Priority: Minor
> Labels: pull-request-available
> Fix For: 1.10.0
>
>
> In order to better integrate with the {{DispatcherRunner}}, all
> {{Dispatchers}} should report their final application status via a shut down
> future (see FLINK-14281). Therefore, I propose to a shut down future to the
> {{Dispatcher}}.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)