[
https://issues.apache.org/jira/browse/FLINK-14919?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
zhijiang reassigned FLINK-14919:
--------------------------------
Assignee: Aihua Li
> Add performance e2e test suite for basic operations
> ---------------------------------------------------
>
> Key: FLINK-14919
> URL: https://issues.apache.org/jira/browse/FLINK-14919
> Project: Flink
> Issue Type: Sub-task
> Components: Tests
> Reporter: Yu Li
> Assignee: Aihua Li
> Priority: Major
> Fix For: 1.10.0
>
>
> Add the test suite for basic Flink operations as proposed in
> [FLIP-83|https://cwiki.apache.org/confluence/display/FLINK/FLIP-83%3A+Flink+End-to-end+Performance+Testing+Framework].
> Target at completing the work before 1.10 so we could use it to guard the
> release.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)