[
https://issues.apache.org/jira/browse/FLINK-15354?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Yu Li updated FLINK-15354:
--------------------------
Fix Version/s: 1.10.0
> Start and stop minikube only in kubernetes related e2e tests
> ------------------------------------------------------------
>
> Key: FLINK-15354
> URL: https://issues.apache.org/jira/browse/FLINK-15354
> Project: Flink
> Issue Type: Bug
> Reporter: Yang Wang
> Assignee: Yang Wang
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.10.0
>
> Time Spent: 10m
> Remaining Estimate: 0h
>
> Currently, we start minikube in {{nightly.sh for every e2e test}}, and it
> will never be stopped. It is unnecessary and will occupy some resources on
> travis. I think the minikube should only be started in the kubernetes related
> test(\{{test_kubernetes_embedded_job.sh}}) and need to be stopped once the
> test finished.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)