[
https://issues.apache.org/jira/browse/FLINK-16694?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17063232#comment-17063232
]
Piotr Nowojski commented on FLINK-16694:
----------------------------------------
another instance in the same build (
https://api.travis-ci.org/v3/job/664469529/log.txt )
> Resuming Externalized Checkpoint end-to-end test failed on travis
> -----------------------------------------------------------------
>
> Key: FLINK-16694
> URL: https://issues.apache.org/jira/browse/FLINK-16694
> Project: Flink
> Issue Type: Bug
> Components: Runtime / Metrics, Tests
> Affects Versions: 1.9.2
> Reporter: Piotr Nowojski
> Priority: Major
>
> Running 'Resuming Externalized Checkpoint (rocks, incremental, scale down)
> end-to-end test' failed on travis (release-1.9 branch) with the error:
> {code:java}
> The job exceeded the maximum log length, and has been terminated.
> {code}
> https://api.travis-ci.org/v3/job/664469537/log.txt
> Probably because of metrics logging.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)