[
https://issues.apache.org/jira/browse/FLINK-16917?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Robert Metzger updated FLINK-16917:
-----------------------------------
Priority: Blocker (was: Critical)
> "TPC-H end-to-end test (Blink planner)" gets stuck
> --------------------------------------------------
>
> Key: FLINK-16917
> URL: https://issues.apache.org/jira/browse/FLINK-16917
> Project: Flink
> Issue Type: Bug
> Components: Table SQL / Planner, Tests
> Affects Versions: 1.11.0
> Reporter: Robert Metzger
> Priority: Blocker
> Labels: test-stability
>
> The message you see from the CI system is
> {code}
> ##[error]The job running on agent Hosted Agent ran longer than the maximum
> time of 240 minutes. For more information, see
> https://go.microsoft.com/fwlink/?linkid=2077134
> {code}
> Example:
> https://dev.azure.com/rmetzger/Flink/_build/results?buildId=6899&view=logs&j=c88eea3b-64a0-564d-0031-9fdcd7b8abee
> The end of the log file looks as follows:
> {code}
> 2020-03-31T23:00:40.5416207Z [INFO]Run TPC-DS query 97 success.
> 2020-03-31T23:00:40.5439265Z [INFO]Run TPC-DS query 98 ...
> 2020-03-31T23:00:40.8269500Z Job has been submitted with JobID
> eec4759ae6d585ee9f8d9f84f1793c0e
> 2020-03-31T23:01:33.4757621Z Program execution finished
> 2020-03-31T23:01:33.4758328Z Job with JobID eec4759ae6d585ee9f8d9f84f1793c0e
> has finished.
> 2020-03-31T23:01:33.4758880Z Job Runtime: 51093 ms
> 2020-03-31T23:01:33.4759057Z
> 2020-03-31T23:01:33.4760999Z [INFO]Run TPC-DS query 98 success.
> 2020-03-31T23:01:33.4761612Z [INFO]Run TPC-DS query 99 ...
> 2020-03-31T23:01:33.7297686Z Job has been submitted with JobID
> f47efc4194df2e0ead677fff239f3dfd
> 2020-03-31T23:01:50.0037484Z ##[error]The operation was canceled.
> 2020-03-31T23:01:50.0091655Z ##[section]Finishing: Run e2e tests
> {code}
> Notice the time difference between "Job has been submitted" and "The
> operation was canceled.". There was nothing happening for 20 minutes.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)