[ 
https://issues.apache.org/jira/browse/FLINK-16795?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17136364#comment-17136364
 ] 

Robert Metzger edited comment on FLINK-16795 at 6/16/20, 5:42 PM:
------------------------------------------------------------------

I guess all these new failures are caused by FLINK-18311. 



was (Author: rmetzger):
I guess all these new failures are caused by FLINK-18291. 


> End to end tests timeout on Azure
> ---------------------------------
>
>                 Key: FLINK-16795
>                 URL: https://issues.apache.org/jira/browse/FLINK-16795
>             Project: Flink
>          Issue Type: Bug
>          Components: Build System / Azure Pipelines, Tests
>    Affects Versions: 1.11.0
>            Reporter: Robert Metzger
>            Assignee: Robert Metzger
>            Priority: Blocker
>              Labels: pull-request-available
>             Fix For: 1.11.0
>
>         Attachments: image.png
>
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> Example: 
> https://dev.azure.com/rmetzger/Flink/_build/results?buildId=6650&view=logs&j=08866332-78f7-59e4-4f7e-49a56faa3179
>  or 
> https://dev.azure.com/rmetzger/Flink/_build/results?buildId=6637&view=logs&j=c88eea3b-64a0-564d-0031-9fdcd7b8abee&t=1e2bbe5b-4657-50be-1f07-d84bfce5b1f5
> {code}##[error]The job running on agent Azure Pipelines 6 ran longer than the 
> maximum time of 200 minutes. For more information, see 
> https://go.microsoft.com/fwlink/?linkid=2077134
> {code}
> and {code}##[error]The operation was canceled.{code}



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to