[
https://issues.apache.org/jira/browse/FLINK-16694?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17195159#comment-17195159
]
Yangze Guo commented on FLINK-16694:
------------------------------------
[~chesnay] Hi, I just wonder does it make more sense to print the last 500
lines? The clue is more likely to be there.
> Resuming Externalized Checkpoint end-to-end test failed on travis
> -----------------------------------------------------------------
>
> Key: FLINK-16694
> URL: https://issues.apache.org/jira/browse/FLINK-16694
> Project: Flink
> Issue Type: Bug
> Components: Runtime / Metrics, Tests
> Affects Versions: 1.9.2
> Reporter: Piotr Nowojski
> Assignee: Chesnay Schepler
> Priority: Critical
> Labels: pull-request-available, test-stability
> Fix For: 1.12.0
>
>
> Running 'Resuming Externalized Checkpoint (rocks, incremental, scale down)
> end-to-end test' failed on travis (release-1.9 branch) with the error:
> {code:java}
> The job exceeded the maximum log length, and has been terminated.
> {code}
> https://api.travis-ci.org/v3/job/664469537/log.txt
> https://travis-ci.org/github/apache/flink/builds/664469494
> This error is probably because of metrics logging and it's masking some other
> underlying issue, potentially FLINK-16695 as they happened in the same build.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)