[ 
https://issues.apache.org/jira/browse/FLINK-19553?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

liufangliang updated FLINK-19553:
---------------------------------
    Description: 
As shown in the picture below, The latest completed checkpoint ID is 11113, but 
the latest failed checkpoint ID is 5370. The two IDs are too far apart .The 
failure time in HH:mm:ss format is difficult to determine the specific failure 
date of the checkpoint.

 

!image-2020-10-09-15-15-27-768.png|width=980,height=90!

!image-2020-10-09-15-14-42-491.png|width=981,height=80!

  was:
As shown in the picture below, The latest completed checkpoint ID is 11113, but 
the latest failed checkpoint ID is 5370. The two IDs are too far apart .The 
failure time in HH:mm:ss format is difficult to determine the specific failure 
date of the checkpoint.

 

!image-2020-10-09-15-15-27-768.png!

!image-2020-10-09-15-14-42-491.png!


> The format of checkpoint Completion Time and Failure Time should be changed 
> from HH:mm:ss to yyyy-MM-dd HH:mm:ss
> ----------------------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-19553
>                 URL: https://issues.apache.org/jira/browse/FLINK-19553
>             Project: Flink
>          Issue Type: Improvement
>          Components: Runtime / Web Frontend
>            Reporter: liufangliang
>            Priority: Minor
>         Attachments: image-2020-10-09-15-14-42-491.png, 
> image-2020-10-09-15-15-27-768.png
>
>
> As shown in the picture below, The latest completed checkpoint ID is 11113, 
> but the latest failed checkpoint ID is 5370. The two IDs are too far apart 
> .The failure time in HH:mm:ss format is difficult to determine the specific 
> failure date of the checkpoint.
>  
> !image-2020-10-09-15-15-27-768.png|width=980,height=90!
> !image-2020-10-09-15-14-42-491.png|width=981,height=80!



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to