Yun Gao created FLINK-22087:
-------------------------------
Summary: CheckpointPlanCalculator should abort checkpoint if tasks
is in canceling/canceled and so on
Key: FLINK-22087
URL: https://issues.apache.org/jira/browse/FLINK-22087
Project: Flink
Issue Type: Task
Components: Runtime / Checkpointing
Reporter: Yun Gao
Fix For: 1.13.0
When refactoring the checkpoint triggering logic in
[FLINK-21067|https://issues.apache.org/jira/browse/FLINK-21067], it tries to
also support the FINISHED state, but it change the abort condition from ==
RUNNING to != (CREATED, SCHEDULED, DEPLOYING), which makes the checkpoint could
not be aborted in these cases. This might happen if during trigger there is
also job failover. It might cause trigger failure and make checkpoint has to
wait for timeout.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)